Sorry I have been MIA... work is taking up most of my time lately.  Just wanted to give  a quick update on some recent service requests and some stuff we have been working on!

Service Requests:

We've been getting leaks in our basement under the front of our house.  There is a crack in the foundation at the spot of leakage so we assumed it was getting in through there.  However, when RH came to check it out, we discovered that the water was actually getting up under the siding and coming in above the foundation.  Apparently the culprit was an incorrectly installed stoop.  Now they have to come back and take off a whole bunch of siding and replace park of our framing that is already water damaged.  I'm a bit nervous because it's somewhat of a major fix, but hopefully it will go smoothly.

We had also been having problems with a banging heater, which they easily resolved with some extra screws where pipes were loose.

We lost some siding during the crazy windstorms down here last week.

And the final thing is the infamous shower!  This is the third (hopefully final) time we are having our master bathroom shower tiles fixed! 

Progress:

We have been working hard on our family room!  We did some painting last weekend, bought some awesome new furniture and I've been working on some DIY wall art!  Progress photos to come soon!

We have resumed work on the deck as well!  We are in the middle of installing our drainage system and we have ordered all of our PVC decking and railing materials, which should be arriving this week.  Once we are finished I'll share the breakdown of costs.  Let's just say our original budget was a little off. :) 

I hope everyone had a great St. Patrick's Day!

6 comments:

  1. Thanks for blogging! I think those that continue blogging after moving provide some of the most helpful pieces of information. I hope everything gets fixed in a timely manner. Problems aside, your home looks beautiful.

    ReplyDelete
  2. Geesh Colette! Sorry to hear about all the service requests. It's nice to see you back and I can't wait to see your deck.

    ReplyDelete
  3. No wonder you have not blogged…you've been busy. I'm sorry to hear about some of the structural fixes, but you guys are on top of it, and that's good. I look forward to seeing your furniture and wall art too!

    ReplyDelete
  4. I am actually going to be building almost the identical deck as you (have a Venice, so a little smaller morning room). I am also considering either the Timbertech XLM or Azek deck. Could you possible take a picture of how you connected the two tiers of your deck (I'm assuming using stringers)? I'm curious how you guys did it. Thanks! Great job!

    ReplyDelete
    Replies
    1. Hi Robert, yes we are using stringers (custom cut since our elevation difference is not quite divisible by the standard stair rise). We don't have the steps between the two levels done yet, but I will definitely take pictures along the way and share them with you. Unfortunately we got some snow today that is slowing us down!

      Delete

I am so thrilled that you stopped by and I loooove comments! Leave me some love and I will respond shortly. Peace and love – Colette.